Bridge collapseCourtesy of AP by Mike Baker and Joan Lowy: Thousands of bridges around the United States may be one freak accident or mistake away from collapse, even if the spans are deemed structurally sound.

The bridges are kept standing by engineering design, not supported with brute strength or redundant protections like their more modern counterparts. Regulators call the more risky spans “fracture-critical,” meaning that if a single, vital component is compromised, the bridge can crumple.

Those vulnerable crossing carry millions of drivers every day. In Boston, six-lane highway 1A near Logan airport includes a “fracture critical” bridge over Bennington Street. In northern Chicago, an Interstate 90 overpass over Ashland Avenue is in the same category. An Interstate 880 bridge over Fifth Avenue in Oakland, Calif., is also on the list.

Also in that category is the Interstate 5 bridge over the Skagit River north of Seattle, which collapsed into the water days ago after an oversize truck load clipped the steel truss, according to official statements.

Bridge collapseAuthorities have focused in recent years on the desperate need for money to repair thousands of bridges deemed structurally deficient, which typically means a major portion of the bridge is in poor condition or worse. But the I-5 bridge that collapsed Thursday is not in that category, highlighting another major problem with the nation’s infrastructure: Although it’s rare, some bridges deemed to be fine structurally can still be crippled if they are struck hard enough in a critical spot.

“It probably is a bit of a fluke in that sense,” said Charles W. Roeder, a professor of civil and environmental engineering at the University of Washington.

While the I-5 truck’s cargo suffered only minimal damage, it left chaos in its wake, with two vehicles flying off the edge of the broken bridge into the river below. Three people involved escaped with non-life-threatening injuries.

The most notorious failure of a fracture-critical bridge was the collapse of the Interstate 35W bridge in Minneapolis during rush hour on Aug. 1, 2007, that killed 13 people and injured more than 100. The National Transportation Safety Board concluded that the cause of the collapse was an error by the bridge’s designers — a gusset plate, a key component of the bridge, was too thin. The plate was only half of the required one-inch thickness.

Bridge collapseBecause the bridge’s key structures lacked redundancy — if one piece fails, another piece will prevent the bridge from falling — when the gusset plate broke, much of the bridge collapsed.

Mark V. Rosenker, who was chairman of the NTSB during the I-35W bridge investigation, said the board looked into whether other fracture-critical bridges were collapsing. They found a few cases, but not many, he said.

“Today, they’re still building fracture-critical bridges with the belief that they’re not going break,” Rosenker said.

Fracture-critical bridges, like the I-5 span in Washington, are the result of Congress trying to cut corners to save money rather than a lack of engineering know-how, said Barry B. LePatner, a New York real estate attorney and author of “Too Big to Fall: America’s Failing Infrastructure and the Way Forward.”

About 18,000 fracture-critical bridges were built from the mid-1950s through the late 1970s in an effort to complete the nation’s interstate highway system, which was launched under President Dwight D. Eisenhower, LePatner said in an interview. The fracture-critical bridge designs were cheaper than bridges designed with redundancy, he said.

Thousands of those bridges remain in use, according to an Associated Press analysis.

“They have been left hanging with little maintenance for four decades now,” LePatner said. “There is little political will and less political leadership to commit the tens of billions of dollars needed” to fix them.

There has been little focus or urgency in specifically replacing the older “fracture-critical” bridges, in part because there is a massive backlog of repair work for thousands of bridges deemed to be structurally problematic. Rep. Judy Clibborn, a Democrat who heads the Washington state House Transportation Committee, has been trying to build support for a tax package to pay for major transportation projects. But her plan wouldn’t have done anything to revamp the bridge that collapsed.

National bridge records say the I-5 crossing over the Skagit River had a sufficiency rating of 57.4 out of 100 — a score designed to gauge the capacity of the bridge to remain in service. To qualify for federal replacement funds, a bridge must have a rating of 50 or below. A bridge must have a sufficiency rating of 80 or below to qualify for federal rehabilitation funding.

Hundreds of bridges in Washington state have worse ratings than the one that collapsed, and many around the country have single-digit ratings.

Clibborn said the Skagit River crossing wasn’t even on the radar of lawmakers because state officials have to prioritize by focusing on bridges with serious structural problems that are at higher risk of imminent failure.

Along with being at risk from a critical impact, the I-5 bridge was deemed to be “functionally obsolete,” which essentially means it wasn’t built to today’s standards. Its shoulders were narrow, and it had low clearance.

There are 66,749 structurally deficient bridges and 84,748 functionally obsolete bridges in the United States, including Puerto Rico, according to the Federal Highway Administration. That’s about a quarter of the 607,000 total bridges nationally. States and cities have been whittling down that backlog, but slowly. In 2002, about 30 percent of bridges fell into one of those two categories.

Spending by states and local government on bridge construction adjusted for inflation has more than doubled since 1998, from $12.3 billion to $28.5 billion last year, according to the American Road and Transportation Builders Association. That’s an all-time high.

“The needs are so great that even with the growth we’ve had in the investment level, it’s barely moving the needle in terms of moving bridges off these lists,” said Alison Premo Black, the association’s chief economist.

There is wide recognition at all levels of government that the failure to address aging infrastructure will likely undermine safety and hinder economic growth. But there is no consensus on how to pay for improvements. The federal Highway Trust Fund, which provides construction aid to states, is forecast to go broke next year. The fund gets its revenue primarily from federal gas and diesel taxes. But revenue isn’t keeping up because people are driving less and there are more fuel-efficient cars on the road.

Bridge repairNeither Congress nor the White House has shown any willingness to raise federal gas taxes, which haven’t been increased since 1993. Many transportation thinkers believe a shift to taxes based on miles traveled by a vehicle is inevitable, but there are privacy concerns and other difficulties that would preclude widespread use of such a system for at least a decade.

Transportation spending got a temporary boost with the economic stimulus funds approved by Congress after President Obama was elected. Of the $27 billion designated for highway projects under the stimulus program, about $3 billion went to bridge projects, Black said.

States are looking for other means to raise money for highway and bridge improvements, including more road tolls, dedicating a portion of sales taxes to transportation and raising state gas taxes. Clibborn, the Washington state lawmaker, has proposed a 10-cent gas hike to help pay for projects, though the effort has been held up by a dispute over how to rebuild the Columbia River bridge connecting Vancouver, Wash., and Portland, Ore.

“We can’t possibly do it all in the next 10 years,” Clibborn said. “But we’re going to do the first bite of the apple.”

Category: Featured, General Update, Transit News